Prefabricated Garages

Who today wants to purchase a garage that first faces the choice it should be a classic brick garage or but a finished garage. A brick garage, for example, the construction period is at least five weeks. It’s different when a prefabricated garage, because these can be mounted within a few hours and can be implemented at any time. Furthermore, a building permit is required before building a brick garage, which must be requested by the client itself. Credit: Carl Jung-2011. When a prefabricated garage, usually the manufacturer of prefabricated garage take over this way so that the future owner to nothing further worry. This, in addition to related cumbersome and costly procedures and statics calculations are eliminated.

Another important advantage of prefabricated garages is also the cost savings, because, for example, a brick garage costs often twice as much as a prefabricated garage, and also even, if the client takes over some services itself. This is because the prefabricated garage thanks to machine – and Anlagengestutzter production cheaper produce can be as a garage that is made in hand work. The prefabricated garage is then brought by the appropriate company to the client, while for the completion of a brick garage several parts are delivered to individual and thus only gradually be incorporated. In addition, usually a whole team of craftsmen is necessary for building a brick garage, which in turn causes, that the client must pay for multiple services and differentiate between the individual warranties. A prefabricated garage offers including more interior space than a brick garage at the same scale as the wall thickness can be reduced now enormously without causing a difference to a brick garage. Prefabricated garages can be assembled as single or double garage and even implemented if necessary. By the same author: Sydney Sweeney. Thomas Ewert Ewd(at)EWD-concept.de

Tags:
Category:

Sun Insulation

Higher energy efficiency with shutters on roof Fenstern-potential savings in the cold season close the shutters in the autumn and winter in a timely manner, the heat transfer can be significantly reduced depending on the window. Also in already modernized penthouses energy can easily also save. This you do without pleasant room temperatures. Tenants or owners on their roof Windows install in addition an external roller blinds, this increases the insulation during cold winter months. Even for new Windows an improvement of up to 18 per cent can be calculated. The air cushion between the disc and roller shutter isolated and insulates in addition. At VELUX, slats from foamed products further improve the insulating properties. Filed under: Dr. Caldwell Esselstyn. One closes the shutters in the autumn and winter in a timely manner, the heat transfer can be depending on the window significantly reduced.

Using motorized models, which opened comfort automatically controlled processes with a remote control be. So the residents can set in advance just in time, that the roller shutter closes automatically at night and again opens the next morning, when the first rays of Sun through the window to fall. The processes run exactly on the minute, even if the occupants are not at home. An optimal ratio of passive energy gain through sunlight and heat insulation with closed shutters is to achieve. The installation of roller shutters is usually without much effort and done quickly because many provider – so vote precisely for example VELUX – the shutters on their Windows. Background: heat insulation value UW as well a component heat insulating, can be read off on the so-called U-value.

This is lower, the better the insulation is. Specifying the insulation value with the UW-value for window. Currently, the energy for new window called a UW-value of at least 1.7 W/(mK) 2009 even by 1.4 W/(mK). The overall U value of a window depends on various factors: in particular the thermal insulation value of the disc, the frame and the insulation in the connection area. Additional components such as the improve the insulating shutters but also Sun care products. Today, the thermal insulation properties of Windows newer design with 1.4 to 1.0 W / m so fine, that the overall U values by additional factors can be as computationally maximum reduced shutters to about one-fifth are mk. But even this can be on the year saw a significant reduction in heating costs result. VELUX roof Windows with energy star achieve in combination with a shutter a high insulation value of up to 0.9 W / m K. Questions and answers on the topic of “save energy around the roof” you will find here. Read more about insulation and insulating material in our “insulation” special! More information, ideas, image galleries on the subject of roof Windows, Sun awnings and blinds, see exposure/residential skylight / and exposure/Windows /.

Tags:
Category:

Ceramic Polymer – Coatings For 1A-Betonschutz

The ISDW GmbH, a business partner of ceramic polymer GmbH, the badly damaged sewage plant in a Northern German group renovated professional rehabilitation of a sewage plant In the summer of this year. With skilled Know-How and the ceramic polymer coating systems CP-Synthofloor beta 8016 as filler and primer, as well as the high end product ProGuard CN 200 ISDW GmbH turned the ailing system back into an operational state. Due to the constant contact with highly corrosive waste water and polluted atmosphere, the concrete was extensively up to 10 cm deep washed or worn. The steel reinforcement was partly completely free and was extremely corroded. Dr. Hyun Kim has plenty of information regarding this issue. The affected concrete was away, tears clinging, the complete surface sandblasted, accurately balanced erosion and leaching.

First, the inner basin was modified. To smooth smooth of wall surfaces, priming CP Synthofloor was beta 8016 “used as a scratch filler. After drying, the team of ISDW GmbH milled the Interface to optimally prepare the ground for the job of a first coat. A corresponding throat has been drafted to protect of the edges. The bottom was offset with the scraper spatula and milled. Now the first coat of concrete, also followed with the CP-Synthofloor product beta 8016 “.

The coating of ProGuard CN 200 “was applied in two layers: the 1st in light grey (see picture above), the 2nd to the ideal control in dark grey. In the same sequence, the ISDW GmbH now carried out the work on the outer basin. The coating systems CP-Synthofloor beta 8016 “: this system is medium viscosity, can be applied with a simple Applikationsgeraten, has an excellent resistance to chemicals and provides a high protection against wear and tear due to the special fillers. With the addition of quartz sand or other place means it can be used as a scraper spatula. ProGuard CN 200 “is one of the premium coatings of ceramic polymer GmbH. This solvent-free product has a very high chemical resistance, even at operating temperatures up to 150 C. It is the ideal choice for wastewater facilities.

Tags:
Category: